335-v1 |
Perturbation Analysis for DTL Field Control |
Rihua Zeng |
RF
|
19 Jun 2014 |
334-v1 |
Perturbation Analysis for Spoke Cavity Field Control |
Rihua Zeng |
RF
|
19 Jun 2014 |
333-v2 |
Cavity Sorting at ESS |
Emanuele Laface et al. |
Beam Physics
RF
|
12 Jun 2014 |
303-v1 |
Field Parametrization with Particle Integration by Tobias Lindqvist (ESS) |
Christian Böhme |
RF
|
16 Dec 2013 |
287-v1 |
IFJ PAN contribution to international projects by Dariusz Bocian (IFJ PAN) |
Christian Böhme |
RF
|
16 Dec 2013 |
307-v2 |
ESS Design Manual |
Steve Peggs |
ESS General
LLRF
SCRF
NCRF
Controls
Beam Instrumentation
Vacuum
Beam Physics
ES&H
RF
Cryogenics
|
08 Nov 2013 |
302-v1 |
Detuning errors in SC resonators |
Stephen Molloy |
LLRF
|
12 Sep 2013 |
300-v1 |
Loaded Q Calculations for the ESS High Beta Linac |
David McGinnis |
SCRF
|
05 Sep 2013 |
298-v1 |
Field Stability Issue for Normal Conducting Cavity under Beam Loading |
Rihua Zeng |
NCRF
|
28 Aug 2013 |
297-v1 |
Loaded Q Calculations for the ESS Spoke Linac |
David McGinnis |
SCRF
|
26 Aug 2013 |
296-v1 |
Loaded Q Calculations for the ESS Medium Beta Linac |
David McGinnis |
RF
|
23 Aug 2013 |
295-v1 |
Loaded Q Calculations for the ESS Superconducting RF Linac |
David McGinnis |
SCRF
|
13 Aug 2013 |
294-v1 |
Transit Time Equivalent Circuit for a Superconducting RF Cavity |
David McGinnis |
RF
|
08 Aug 2013 |
290-v1 |
Envelope Equations for a Superconducting RF Cavity |
David McGinnis |
RF
|
30 Jul 2013 |
274-v15 |
ESS Technical Design Report |
Steve Peggs |
ESS General
LLRF
SCRF
NCRF
Controls
Beam Instrumentation
Vacuum
Beam Physics
ES&H
RF
Cryogenics
|
27 Jun 2013 |
280-v1 |
Comparison of 5- & 6-cell Medium-B Linac based on the Nearest Passband Mode |
Mohammad Eshraqi et al. |
SCRF
Beam Physics
|
05 Jun 2013 |
275-v1 |
Interleaving of Modulator to Klystron Connections. |
Anders J Johansson |
RF
|
07 May 2013 |
270-v1 |
Prototype uTCA.4 BPM Electronics Test |
Hooman Hassanzadegan |
LLRF
Controls
Beam Instrumentation
|
27 Mar 2013 |
269-v1 |
An overview of the crate options and timing requirements for the LLRF and BPM systems of the ESS Linac |
Hooman Hassanzadegan |
LLRF
Controls
Beam Instrumentation
|
27 Mar 2013 |
263-v1 |
Power Overhead Reduction Considerations for RF Field Control in Beam Commissioning |
Rihua Zeng |
RF
|
14 Mar 2013 |
253-v1 |
Design Considerations for Phase Reference Distribution |
Rihua Zeng et al. |
RF
|
11 Feb 2013 |
252-v1 |
The RF Power Consumption in the ESS Spoke Linac |
Vitaliy Goryashko et al. |
SCRF
|
05 Feb 2013 |
244-v1 |
Some Calculation on Power Overhead in ESS High Beta Cavity Control |
Rihua Zeng |
RF
|
28 Nov 2012 |
219-v1 |
Notes from SLAC uTCA review 4-5 June 2012 |
Anders J Johansson |
LLRF
Controls
Beam Instrumentation
|
23 Aug 2012 |
218-v1 |
Medium Beta Elliptical Cavity-Cryomodule Technology Demonstrator |
Christine Darve et al. |
ESS General
SCRF
Cryogenics
|
15 Aug 2012 |
217-v1 |
Commissioning Plan |
John Galambos |
ESS General
Controls
Beam Instrumentation
Vacuum
Beam Physics
RF
Cryogenics
|
15 Aug 2012 |
215-v1 |
SNS Project Completion Report |
John Galambos |
ESS General
Controls
Beam Instrumentation
Vacuum
Beam Physics
RF
Cryogenics
|
24 Jul 2012 |
210-v1 |
IOT Review |
Rebecca Seviour |
RF
|
14 Jun 2012 |
209-v1 |
Same Order Modes (SOMs) |
Robert Ainsworth |
SCRF
Beam Physics
|
12 Jun 2012 |
206-v1 |
The ESS LLRF Control System |
Rihua Zeng |
LLRF
|
04 Jun 2012 |
205-v2 |
Investigation of Feedback Control for Klystron Ripple_IPAC12 Paper |
Anders J Johansson et al. |
LLRF
|
04 Jun 2012 |
204-v1 |
Control Performance Improvement by Using Feedforward in LLRF_IPAC12 Paper |
Anders J Johansson et al. |
LLRF
|
04 Jun 2012 |
195-v1 |
Timing System Frequency Choice for ESS |
Anders J Johansson |
LLRF
|
08 May 2012 |
194-v1 |
ESS RF System Design |
Stephen Molloy |
RF
|
08 May 2012 |
192-v1 |
Transient cavity studies |
Stephen Molloy |
SCRF
|
13 Apr 2012 |
147-v2 |
Dependence of Cavity Coupling on Beam Velocity |
Stephen Molloy |
RF
|
05 Apr 2012 |
146-v2 |
Dependence of cavity coupling on beam velocity |
Stephen Molloy |
RF
|
29 Mar 2012 |
187-v1 |
Power Overhead Calculation for Lorentz Force Detuning_talk |
Rihua Zeng |
LLRF
|
26 Mar 2012 |
186-v1 |
AN ASSESSMENT ON KLYSTRON MODULATOR TOPOLOGIES FOR THE ESS PROJECT |
Karin Rathsman |
RF
|
14 Mar 2012 |
119-v1 |
THE RF POWER SOURCE FOR THE HIGH BETA ELLIPTICAL CAVITIES OF THE ESS LINAC |
Karin Rathsman et al. |
RF
|
14 Mar 2012 |
185-v1 |
The European Spallation Source RF System Design |
David McGinnis |
RF
|
13 Mar 2012 |
184-v1 |
Power Overhead Calculation for Lorentz Force Detuning |
Rihua Zeng |
LLRF
|
09 Mar 2012 |
178-v1 |
Empirical Model For ESS Klystron Cathode Voltage |
David McGinnis |
RF
|
02 Mar 2012 |
176-v1 |
Some Considerations on Predetuning for Superconducting Cavity |
Stephen Molloy et al. |
LLRF
|
27 Feb 2012 |
177-v1 |
Influence of the Droop and Ripple of Modulator on Klystron Output |
Anders J Johansson et al. |
RF
|
27 Feb 2012 |
175-v1 |
Influence of the Droop and Ripple of Modulator on Klystron Output |
Anders J Johansson et al. |
LLRF
|
23 Feb 2012 |
174-v1 |
Some Considerations on Predetuning for Superconducting Cavity |
Stephen Molloy et al. |
LLRF
|
23 Feb 2012 |
173-v1 |
Influence of the Droop and Ripple of Modulator on Klystron Output |
Anders J Johansson et al. |
LLRF
|
23 Feb 2012 |
170-v1 |
RF Seminarino |
Stephen Molloy |
RF
|
17 Feb 2012 |
157-v2 |
An Introduction to LLRF Control |
Rihua Zeng |
LLRF
|
03 Feb 2012 |
162-v2 |
Linac power optimisation including beam-velocity effects |
Stephen Molloy |
SCRF
|
25 Jan 2012 |
161-v2 |
Steady-state calculations for SC cavities |
Stephen Molloy |
SCRF
|
24 Jan 2012 |
158-v4 |
Required power for detuned, loaded, SC cavity |
Stephen Molloy |
RF
|
13 Jan 2012 |
159-v1 |
Splitting the medium beta section |
Stephen Molloy |
SCRF
|
04 Jan 2012 |
156-v1 |
ESS talks at the SLHIPP-1 Meeting at CERN |
Christine Darve et al. |
ESS General
Beam Physics
RF
Cryogenics
|
11 Dec 2011 |
152-v1 |
Optimising high-power input couplers |
Stephen Molloy |
SCRF
|
22 Nov 2011 |
144-v1 |
CW SRF Systems with Ingot Niobium and Their Applications |
Ganapati Myneni |
SCRF
|
09 Nov 2011 |
138-v1 |
Recommendation on Studies Regarding the Installation of HOM Couplers |
Stephen Molloy |
SCRF
|
27 Oct 2011 |
137-v1 |
LLRF Requirement and parameters at ESS_LLRF wokshop talk |
Anders J Johansson et al. |
LLRF
|
21 Oct 2011 |
136-v1 |
Recommendation on studies regarding the installation of HOM couplers |
Stephen Molloy |
SCRF
|
17 Oct 2011 |
131-v1 |
RF Workshop Conclusions |
Stephen Molloy |
RF
|
04 Oct 2011 |
127-v1 |
Conclusions from RF/HOMs Workshop (22nd, 23rd September 2011) |
Stephen Molloy |
SCRF
|
26 Sep 2011 |
47-v1 |
Thought on the RF Power Source and RF Distribution System for High Beta Elliptical Cavities |
Karin Rathsman et al. |
RF
|
13 Sep 2011 |
103-v1 |
Report from RF Power Workshop |
Karin Rathsman et al. |
SCRF
|
13 Sep 2011 |
117-v1 |
Challenges for the Low Level RF Design for ESS-Poster |
Anders J Johansson et al. |
LLRF
|
12 Sep 2011 |
116-v1 |
Challenges for the Low Level RF Design for ESS |
Anders J Johansson et al. |
LLRF
|
12 Sep 2011 |
115-v1 |
Multipacting Analysis for the Superconducting RF Cavity HOM Couplers in ESS |
Robert Ainsworth et al. |
SCRF
|
12 Sep 2011 |
109-v1 |
RF Modeling Plans for the European Spallation Source |
Robert Ainsworth et al. |
RF
|
12 Sep 2011 |
113-v1 |
Bead-Pull Test Bench for Studying Accelerating Structures at RHUL |
Robert Ainsworth et al. |
RF
|
12 Sep 2011 |
99-v2 |
RF sources |
Karin Rathsman |
RF
|
10 Aug 2011 |
104-v1 |
Power Requirements for High beta Elliptical Cavities |
Rihua Zeng |
LLRF
|
13 Jul 2011 |
97-v1 |
Providing the power |
Karin Rathsman |
RF
|
22 Jun 2011 |
96-v1 |
ESS and RF power source |
Karin Rathsman |
ESS General
SCRF
|
15 Jun 2011 |
87-v2 |
Quantifying the risk due to HOMs |
Stephen Molloy |
SCRF
|
01 Jun 2011 |
92-v2 |
An Empircal Study of HOM Frequencies |
Stephen Molloy |
SCRF
|
23 May 2011 |
91-v1 |
RF Power Calculations for High Beta Elliptical Cavities |
Karin Rathsman |
SCRF
|
23 May 2011 |
90-v1 |
RF cavity studies at RHUL,l Simulations & measurement |
Robert Ainsworth |
SCRF
|
20 May 2011 |
68-v1 |
Conclusions from the HOM studies performed by M. Schuh |
Stephen Molloy |
SCRF
|
26 Apr 2011 |
50-v1 |
LLRF Overview and Development in Other Labs |
Rihua Zeng |
LLRF
|
04 Apr 2011 |
22-v1 |
Costs to Shorten the Pulse and Increase the Peak Power |
Karin Rathsman |
RF
|
18 Mar 2011 |
32-v1 |
ESS: EM Fields & SC Cavities in Particle Accelerators |
Stephen Molloy |
SCRF
Beam Physics
|
07 Mar 2011 |
29-v1 |
LLRF Study on RF Power Requirement |
Rihua Zeng |
RF
|
04 Feb 2011 |
27-v1 |
European Spallation Source (ESS): EM Fields & SC Cavities in Particle Accelerators |
Stephen Molloy |
RF
|
01 Feb 2011 |
20-v1 |
Calculations on the RF source and distribution |
Karin Rathsman |
RF
|
01 Feb 2011 |
19-v1 |
First Considerations for the Design of the ESS Cryo-Modules |
Aurelien Ponton |
RF
Cryogenics
|
01 Feb 2011 |
250-v1 |
ESS Frequency Advisory Board Report |
Steve Peggs |
RF
|
28 Jul 2010 |