307-v2 |
ESS Design Manual |
Steve Peggs |
SCRF
ESS General
Controls
Beam Instrumentation
Vacuum
Beam Physics
ES&H
NCRF
RF
LLRF
Cryogenics
|
08 Nov 2013 |
302-v1 |
Detuning errors in SC resonators |
Stephen Molloy |
LLRF
|
12 Sep 2013 |
274-v15 |
ESS Technical Design Report |
Steve Peggs |
SCRF
ESS General
Controls
Beam Instrumentation
Vacuum
Beam Physics
ES&H
NCRF
RF
LLRF
Cryogenics
|
27 Jun 2013 |
270-v1 |
Prototype uTCA.4 BPM Electronics Test |
Hooman Hassanzadegan |
Controls
Beam Instrumentation
LLRF
|
27 Mar 2013 |
269-v1 |
An overview of the crate options and timing requirements for the LLRF and BPM systems of the ESS Linac |
Hooman Hassanzadegan |
Controls
Beam Instrumentation
LLRF
|
27 Mar 2013 |
219-v1 |
Notes from SLAC uTCA review 4-5 June 2012 |
Anders J Johansson |
Controls
Beam Instrumentation
LLRF
|
23 Aug 2012 |
206-v1 |
The ESS LLRF Control System |
Rihua Zeng |
LLRF
|
04 Jun 2012 |
205-v2 |
Investigation of Feedback Control for Klystron Ripple_IPAC12 Paper |
Anders J Johansson et al. |
LLRF
|
04 Jun 2012 |
204-v1 |
Control Performance Improvement by Using Feedforward in LLRF_IPAC12 Paper |
Anders J Johansson et al. |
LLRF
|
04 Jun 2012 |
195-v1 |
Timing System Frequency Choice for ESS |
Anders J Johansson |
LLRF
|
08 May 2012 |
187-v1 |
Power Overhead Calculation for Lorentz Force Detuning_talk |
Rihua Zeng |
LLRF
|
26 Mar 2012 |
184-v1 |
Power Overhead Calculation for Lorentz Force Detuning |
Rihua Zeng |
LLRF
|
09 Mar 2012 |
176-v1 |
Some Considerations on Predetuning for Superconducting Cavity |
Stephen Molloy et al. |
LLRF
|
27 Feb 2012 |
175-v1 |
Influence of the Droop and Ripple of Modulator on Klystron Output |
Anders J Johansson et al. |
LLRF
|
23 Feb 2012 |
174-v1 |
Some Considerations on Predetuning for Superconducting Cavity |
Stephen Molloy et al. |
LLRF
|
23 Feb 2012 |
173-v1 |
Influence of the Droop and Ripple of Modulator on Klystron Output |
Anders J Johansson et al. |
LLRF
|
23 Feb 2012 |
157-v2 |
An Introduction to LLRF Control |
Rihua Zeng |
LLRF
|
03 Feb 2012 |
137-v1 |
LLRF Requirement and parameters at ESS_LLRF wokshop talk |
Anders J Johansson et al. |
LLRF
|
21 Oct 2011 |
117-v1 |
Challenges for the Low Level RF Design for ESS-Poster |
Anders J Johansson et al. |
LLRF
|
12 Sep 2011 |
116-v1 |
Challenges for the Low Level RF Design for ESS |
Anders J Johansson et al. |
LLRF
|
12 Sep 2011 |
104-v1 |
Power Requirements for High beta Elliptical Cavities |
Rihua Zeng |
LLRF
|
13 Jul 2011 |
50-v1 |
LLRF Overview and Development in Other Labs |
Rihua Zeng |
LLRF
|
04 Apr 2011 |